Step 1: Publish the current review files

Keep contracts, financial models and update notes together in bestCoffer Virtual Data Room. Use file-change publication to provide confirmed materials to authorized advisers.

  • Identify the review version: Give contracts, models and attachments stable identifiers, dates and status labels, such as FIN-01_FinancialModel_Pending_v04_20261118.xlsx.
  • Keep an update note: Describe the contract change, affected model inputs, file owner and person responsible for confirming the update.
  • Publish in stages: If the contract is confirmed but the model is still under review, release the contract and update note first. Provide the model after confirmation.
  • Connect old and new references: Record the relationship between the current contract and model, including any parts of the old model that should temporarily not be relied on.
  • Locate supporting materials: Advisers can find project files within their authorized scope and use full-text search for content included in the search index, then verify the actual file identifier and version.

Illustrative example: a solar-and-storage project's engineering contract has changed to CON-02 v03. The owner is still checking construction-period and cash-outflow inputs in FIN-01 v04. The identifiers and process below are synthetic examples.

Example review-file release
FileRelease statusReview purpose
Engineering contract CON-02 v03Release after confirmation by the contract ownerReview the revised schedule and approved attachments
Update note U-2026-018Provide with the contractExplain outstanding model checks and the next supplement
Financial model FIN-01 v04Release after internal confirmationContinue analysis using the confirmed contractual basis

The contract owner and model owner confirm their respective content. A designated reviewer confirms the file set for external release. The project team enters identifiers, version relationships and update notes; the relevant professionals remain responsible for contract interpretation and model inputs.

Step 2: Configure access by adviser role

Use the granular permissions in bestCoffer Virtual Data Room to define access by team, role, file and project stage.

Illustrative adviser-group access
GroupMaterials available in this roundReview focus
Engineering advisersCON-02 v03, approved technical attachments and update noteSchedule and engineering conditions
Financial advisersApproved financial materials and contract-change note; FIN-01 v04 after confirmationModel inputs, analytical assumptions and revisions to earlier comments
Project legal advisersContracts, amendments and approved clause explanationsContract wording and the basis for external responses
  • Open files by stage: Release the confirmed contract first. Keep working models within internal authorized access until confirmed, then adjust the relevant adviser group's access.
  • Set the review method: For contracts primarily reviewed online, use secure online viewing with dynamic watermarks and file-access controls.
  • Confirm downloads separately: If an adviser needs a local model for calculations, confirm the project's download configuration, recipients and handling of copies.
  • Check the external view: Use representative adviser roles to verify the files actually visible, particularly the scope of new attachments.
  • Adjust access as work changes: Recheck team, role and file permissions when advisers change or the project enters another stage.

For participant roles and material scope, see the energy project finance and asset transaction solution.

Step 3: Handle comments, questions and supplements

Use document annotations, comments and Q&A collaboration to retain contract observations, model explanations and follow-up materials in the project review.

  • Raise a clause question: State the contract identifier, version and relevant clause in an annotation or comment.
  • Develop the related question: When finance and contract teams need to respond together, identify the model input and supplementary material required.
  • Confirm the external response: The contract owner explains the contractual basis and the model owner explains the checks, each retaining responsibility for their confirmation.
  • Provide the model supplement: Publish the confirmed model through file-change publication, open it to the appropriate adviser group, and cite it and the update note in the response.
  • Revisit earlier comments: For questions still referring to an old model, state the new reference and ask the adviser whether the opinion needs revision.

Example question: “The schedule in CON-02 v03 has changed. Has the construction-period input in FIN-01 v04 been adjusted?” The response should identify the contract used, the confirmed model version and the parts requiring another review.

If a response involves an attachment available only to legal advisers, provide financial advisers with an approved explanation or disclosure copy and configure its access. Q&A supplements follow the same file-release and permission arrangements.

Step 4: Follow up using activity records

Review the activity audit trail available in bestCoffer Virtual Data Room, export applicable reports, and compare them with Q&A content and adviser feedback.

  • Files open, receipt unconfirmed: Check the group's permissions and available activity records. Ask the project contact to confirm whether the group has obtained the current materials.
  • An old model is still cited: Identify the new model and update note in the relevant question, and ask the adviser to revisit affected comments.
  • A question remains unanswered: Identify the missing explanation, assign it to the appropriate person, and cite formally released files in the response.
  • Comments have been submitted: Associate the feedback with the files used in this round, and record outstanding supplements or further review.

Activity records reflect the events they actually cover. Record receipt and professional review outcomes separately using adviser responses and deliverables. Confirm event coverage, report fields and retention periods for the intended version and configuration.

Download the 2026 model and contract update register (CSV) to record file relationships, confirmation owners, recipient groups, supplements and outstanding matters. The team edits and saves it in its own spreadsheet tool, separately from data-room publication and permissions. See bestCoffer Virtual Data Room for the product's applicable scope.

Step 5: Close external access and prepare the handoff

When a review ends, a transaction pauses or the project enters another stage, check data-room access and files already provided.

  • Adjust access: Review team, role and file permissions. Remove external access no longer needed and explicitly confirm any exceptions.
  • Retain the review basis: Keep the final confirmed contract, model and update note, with the relationship between old and new files.
  • Keep stage records: Retain applicable activity reports, Q&A and adviser confirmations under the project's custody and retention arrangements.
  • Hand over open matters: List unfinished model explanations, supplements and further reviews, identifying the next owner and action.
  • Check downloaded copies: For independent copies such as ordinary Excel models, confirm handling with recipients under the project agreement.

For supported protected PDF contracts, opening rights can be revoked after the revocation command is received. This does not physically delete the file copy on the recipient's device.

Frequently asked questions

How can the contract be released before the updated model?

Publish the confirmed contract and update note through file-change publication, with access configured for each adviser role. State the model checks still pending, then publish the confirmed model and cite the new basis in related Q&A.

How can different advisers review different materials?

Configure granular permissions by team, role, file and project stage. Open the relevant contracts, technical attachments, financial materials and models separately, and verify actual access when attachments or stages change.

How can contract comments be connected to model questions?

In annotations, comments or Q&A, state the contract identifier, version and model input requiring explanation. The response identifies the contract used and cites the formally released model and update note. The project team enters these references.

Does an access record mean the adviser has finished the review?

The audit trail records the events it actually covers. Record receipt and completion of professional review separately, using adviser responses and deliverables.

Will an Excel file already downloaded update automatically?

File publication does not mean a local Excel copy updates automatically. Provide authorized recipients with the formally released model and update note, explain the replacement relationship, and confirm updating or handling of local copies as agreed.

How can protected PDFs be handled at closeout?

For supported protected PDFs, future opening rights can be restricted after the revocation command is received. The device copy is not physically deleted. Handle independent copies such as ordinary Excel files separately under the project agreement.

Related resources

Review the scope of bestCoffer Virtual Data Room and the energy project finance and asset transaction solution. For initial preparation, see the data room setup checklist.

The project, identifiers and register are illustrative. Confirm features, file formats, permission items and record coverage for the intended version and configuration. 2026 is the content edition.

Request an energy project finance VDR demonstration

Use sample contracts, financial models and adviser roles to review file publication, permissions, Q&A supplements and activity records.