Documents for preliminary review
For a chip-design fundraising round, connect engineering progress, cash needs and commercial progress. Documents should show which checks remain after tape-out, whether customer adoption has led to orders, and which technical or delivery milestone this round will fund. Start with six summaries covering equity, financials, product progress, intellectual property, customers and use of funds. Release approved supporting files as detailed due diligence progresses.
This checklist is for fabless chip-design businesses: companies that design chips and use external wafer-foundry and packaging/test resources. Manufacturers and packaging/test businesses need separate equipment, production-line and quality materials; distributors need supplier-authorisation, inventory and fulfilment materials.
The six summaries are an organisational suggestion, not a universal semiconductor due-diligence standard. Cooley’s sample financing due-diligence request list also covers personnel, debt and other matters. Expand the directory for the investor’s requests, transaction scope and actual project.
| Document ID and name | Question it answers | Suggested contents |
|---|---|---|
| CO-01 Corporate and ownership overview | Who is raising funds, and what is the ownership and financing history? | Entity, capitalization, financing history, key-resolution index and unresolved items. |
| FIN-01 Historical financial summary | What operating results have already occurred? | List revenue/cost definitions, R&D expenditure, cash balances and committed spending. State period, source and audit status; present forecasts separately. |
| TEC-01 Product progress register | What is the status of design, tape-out, post-silicon validation and production readiness? | For each chip model, identify technical milestones, test conclusions and open issues; index approved foundry and packaging/test summaries and supporting files. |
| IP-01 IP and licence index | Which results belong to the company, and which depend on third-party licences? | List internally owned work, third-party IP and EDA tool licences separately; identify applicable products, supporting files, terms and open questions. |
| COM-01 Customer and commercial progress summary | What evidence supports customer adoption, volume orders and revenue? | Distinguish sampling, validation, design wins, forecast demand, firm orders and delivery. Disclose customer identity and pricing only within approved scope. |
| FIN-02 Use of funds and assumptions | Which engineering or commercial milestone will this round fund? | Budget applicable tape-out, validation, IP, EDA and production-inventory items by project, with payment dates, cash-flow assumptions and delay scenarios. |
Evidence for tape-out, customer adoption and R&D funding
Tape-out and post-silicon validation: report each stage separately
“Tape-out completed” does not establish whether a chip has met its targets. Tape-out is the point at which the chip design is sent for manufacturing; Arm’s public report uses the term in this sense. Record post-silicon validation after first silicon returns, customer testing and volume-production readiness as separate statuses.
For each chip model and revision, the product owner can organise design targets, actual test results, test conditions, unresolved issues and the next milestone. Keep performance, power or reliability items open while validation continues. If another tape-out is planned, explain the changes, expected expenditure and timing assumptions. Link the test summary to approved reports; initial review does not require default access to RTL source code, GDSII layouts or EDA project files.
Customer adoption and volume orders: use different evidence for each status
Record samples delivered, validation completed, a design win (a customer selecting the chip for its product design), volume orders received and revenue recognised separately. Ambarella’s fiscal 2026 report explains that a design win or customer qualification does not guarantee sales. This is one chip-design company’s risk disclosure, not a basis for assigning the same customer-adoption timetable to every chip company.
For each COM-01 entry, the commercial owner should identify its supporting record, as-of date and outstanding conditions. Separate forecast demand from firm purchase orders. Finance should explain how orders, deliveries and revenue recognition relate. An approved customer-code summary may be used initially; designated advisers can then review contracts, orders or payment evidence for specific questions.
R&D expenditure and cash flow: tie funding to technical and payment milestones
A single R&D budget total does not show how the next tape-out, validation work or production inventory will be funded. The R&D expense discussion in the same report includes personnel, foundry development, third-party IP, software/hardware tools and prototype mask sets. Use these categories to check for applicable omissions in your own budget, without adopting that company’s expense scale or accounting treatment.
Finance and engineering can break FIN-02 down by project: expenditure incurred, contracted but unpaid commitments, expected future expenditure, payment dates and the related engineering or delivery target. Cash-flow forecasts should state assumptions for customer receipts and foundry and packaging/test payments. If validation is delayed or another tape-out is required, show the funding gap and revised arrangements separately instead of relying only on an on-time production forecast.
Wafer foundry and packaging/test: support production plans with supply arrangements
A chip-design company using external manufacturing resources can index approved summaries in TEC-01 identifying foundry and packaging/test partners, the current contracting or purchasing stage, expected lead times, payment arrangements and unconfirmed conditions. A plan or quotation should not be described as reserved capacity. Yield, cost and production-progress statements should identify the batch, data source and estimation conditions.
Provide approved summaries initially. When investors or advisers need to check supply, gross-margin assumptions or delivery capability, release relevant quotations, agreements and test records for those questions. Using foundry services does not mean the design company owns wafer-manufacturing or packaging/test facilities.
Third-party IP and EDA licences: check usable rights and ownership separately
List ownership of internally developed work, third-party IP licences and EDA tool licences separately, linking each to the intended chip product and engineering activity. Arm’s report describes term or use-count limits on some TLA licences. The actual project must be checked against its own contracts; “licence purchased” does not replace a scope review.
Legal and technical owners can record the licensed item, version, purpose, term, fees or renewal arrangements, source-contract clause index and unresolved issues in IP-02. Check any contractual restrictions on external disclosure before access is granted. Release original IP files, tool-licence files and design materials within the approved scope, rather than opening them all when fundraising due diligence begins.
Synthetic worked example: Product A has completed its first tape-out; post-silicon functional-validation feedback is outstanding; the customer is still testing samples; no volume order exists. TEC-01 records tests and outstanding work, COM-01 records customer testing, and FIN-02 records budget assumptions for further validation and a possible additional tape-out. Use the same product and as-of date across the three documents. A fundraising presentation should not describe volume production while its supporting files still show these statuses. This example illustrates the method only.
Disclosure scope for investors, advisers and commercial partners
A customer summary explains commercial progress. A financial adviser may need records supporting revenue, while legal counsel may examine contractual conditions. Project membership alone should not produce identical access. Use the following as a starting point; actual questions and approvals determine the scope.
| Recipient | Initial materials | Further evidence by question | Separate controls |
|---|---|---|---|
| Investor | Six summaries and a gap statement | Approved support for this round’s decisions | Customer identity, pricing and non-public technical details |
| Financial adviser | Financial summary, periods and revenue categories | Accounting and transaction support for the agreed periods | Details and operations required by the mandate |
| Legal counsel | Ownership, IP, licence and material-contract indexes | Approved agreements, resolutions and ownership support | Disclosure restrictions, personal information and third-party materials |
| Technical adviser | Product, technical and collaboration summaries | Approved technical evidence relevant to the question | Specific approval for source code, design files and EDA project materials |
| Commercial partner | Summaries relevant to the specific collaboration | Only evidence required for that collaboration | No inherited investor or adviser access |
Disclosure approval, permission configuration and verification
A complete directory does not establish that external access is ready. Record each file’s version, recipient organization and account, permitted operations, stage and approval on one line. If approval is pending, retain that status and leave the actual opening time uncompleted.
- Select the disclosure version. The owner checks content, date, version and gaps. Prepare and review a limited-disclosure copy where needed.
- Confirm recipients. The approver decides who sees which file and can do what. Check roles and accounts even within the same organization.
- Configure and verify. In bestCoffer Virtual Data Room, configure team, role, file and stage permissions. Use online viewing, dynamic watermarks and access controls where appropriate, then test visibility and permitted operations with the corresponding recipient account.
The template separates approval, actual configuration and account verification into three columns. It does not execute permissions, and watermarks or online viewing do not replace content approval.
Licence agreements and technical materials in detailed due diligence
“Please provide all technical materials” does not define a useful disclosure scope. Ask for the decision, exact evidence and reviewers involved. Product-stage records may answer a progress question; an approved summary and clause index may answer a licence question. Further access to full agreements or technical attachments depends on necessity, agreed restrictions and internal approval.
- Question: Which right, condition or development needs checking?
- Evidence: Does the existing summary answer it? Which support is missing?
- Recipient: Which named adviser needs access, and which operations?
- Approval: Who confirms content and release, and how are scope and duration recorded?
Annotations, comments and Q&A in bestCoffer Virtual Data Room can support these discussions. The team still assigns answer owners and maintains the question-to-evidence link. The room does not determine licence completeness or verify product performance or customer adoption. Source code, design files and EDA project materials remain subject to specific approval.
Supplemental documents and version changes
Synthetic supplement: Legal counsel asks why a licence summary omits its term. The team records Q-01 against IP-02; the legal owner checks the source agreement and prepares an updated summary. The handover should show:
- File: IP-02 licence summary, v1 replaced by v2.
- Change: Term explanation added; owner checks the source document and clause.
- Recipient: The named legal adviser approved for this release, without copying another file’s recipient list.
- Open work: Treatment of the old version, confirmation of the version used and any unanswered part of Q-01.
Publish approved file changes in bestCoffer Virtual Data Room and use activity audit trails or report export to check relevant operations. People still confirm handover and question closure. A view record does not prove understanding or acceptance, or recovery of every old copy.
Fundraising document checklist and access template
The attachment brings together the six summaries, detailed-review files and sensitive attachments, with separate access and supplement registers. Each row records filename, owner, version, recipient, stage and outstanding status. A request requiring specific approval can be registered without first uploading the file.
The synthetic example keeps useful gaps visible: Product A’s validation feedback is outstanding, the licence summary needs a term explanation, and design-file access is unapproved and unopened. These are owner actions, not placeholders to remove.
Start with your business, this round’s questions and the first pack. Use the access register to separate investors, advisers and commercial partners. It provides a concrete basis for discussing document types, participants and staged access.
The metadata-only tool exports and imports JSON and downloads filled HTML. Export before closing: there is no automatic saving, upload, authorization or room synchronization. Project advisers must assess applicability and disclosure obligations; refer IP, export-control and cross-region processing questions to the relevant professionals.
Complete the document list and access register · View the synthetic chip-design example
Frequently asked questions
Can a customer’s chip selection be described as volume-production revenue?
Show customer selection, forecast demand, purchase orders, actual deliveries and revenue recognition separately. Use the supporting records for each status; a design win does not by itself establish sales revenue.
How many years of financial records are needed?
This guide sets no universal period. Agree the scope with investors and financial advisers, then label periods, dates, sources and audit status. Separate historical results from forecasts.
Does due diligence require source-code access?
Not by default. Source code, design files and EDA project materials depend on specific necessity, named experts, restrictions and approval.
Can initial review begin with missing files?
Provide approved summaries and a gap statement, and ask recipients whether they support this round’s decisions. Distinguish missing, awaiting confirmation and not applicable, with an owner for outstanding items.
What documents are needed after tape-out?
Record post-silicon validation, unresolved issues, customer testing and production readiness separately. The product-progress record should identify the chip revision, evidence and as-of date; the use-of-funds statement should explain budget assumptions for further validation and a possible additional tape-out.
Sources
Ambarella’s annual report illustrates the distinction between customer selection, qualification and sales, and the R&D cost categories that company discloses. Arm’s report explains tape-out and some IP licence arrangements. These are company-specific primary disclosures, not an industry-wide due-diligence standard. Cooley and CMS inform general financing-document organisation. Checklist fields, budget breakdowns and access steps are this article’s recommendations; product capabilities remain subject to the current website and project agreement.